Education
2004-2010
Tertiary EducationCracow University of Technology
Faculty of Mechanical Engineering. M.Sc. in Materials Science
2000-2004
Secondary EducationHigh School No. 1 in Jaslo
Majors in Mathematics and Computer Science
Experience
2018 - Current
The Hague- Collecting infrastructure requirements including: Citrix, Application and Database server requirements for S3D and related systems. Setup and maintenance of S3D Global Workshare. Setup and monitoring of SQL replications.
- Collecting and implementing project requirements. Setting up IT database servers and database instances for S3D projects (production, testing and development).
- Set up batch servers for batch processing.
- Working with Construction Team to implement AWP (Advanced Work Packaging) best practice within Smart 3D.
- Assisting Project Management team, Area leads and Discipline leads with providing required reports and system know-how.
- Coordinating scope, overall schedule, deliverables, milestones and coordination procedures.
- Coordinating subcontractors, other offices and JV partners within Global Workshare Environment.
- Configuration and scheduling conversion of 3rd party 3D Models using SPIOP, creating and adjusting mapping as needed. Incorporating 3D reference models into Smart3D and visualisation tools.
- Working with the SP Materials team to analyse and identify MTO requirements.
- Coordinating and implementing brownfield Point Cloud data in S3D and other visualisation tools.
- Identifying and analysing automation opportunities within SmartPlant 3D using API or scripts, including but not limited to:
- Piping Support Development utilizing C# and .NET: Implemented piping supports that adhered to the stringent requirements of the large LNG project. Ensured that all developments were in compliance with the global company standards, maintaining consistency and quality across all deliverables. Developed comprehensive, detailed drawings (DBQ) of piping supports for our fabrication subcontractor. Created an automated process for generating quality check reports, streamlining the review process and ensuring high standards of accuracy and reliability.
- Development of processes to automatically bring instruments dimensional data from SmartPlant Instrumentation (SPI) to S3D Catalog in a non-integrated environment.
- Development of custom tools including Process Line List import tool for non-integrated environments, process parameters calculation tools, tools to visualise construction progress on-site etc.
- Development and extraction of S3D data to feed custom made tools and workflows for isometric progress tracking as well as asset information maturity status tracking.
- Development of database based service that checks licences usage and sends notification emails to users and/or admins if users are overusing licences.
- Configuration of project rules (naming rules, design rules etc.).
- Configuration of Interference Checking process. Implementation and adjusting of codeless and/or code based interference rules based on project requirements.
- Complex reporting using SQL and API. Integrating reports into the Company project tools.
- Participating in the development of new custom applications used to support and automate the Smart 3D tasks.
- Creation and customization of Reference Data per project/company standards. Project Catalog, Parts and codelist modifications. Defining and creating required custom attributes. Reference Data change management.
- Supporting SPRD Piping Engineer and providing help to troubleshoot piping spec issues.
- Configuration of Smart 3D project deliverable templates including piping isometrics, drawing viewstyles and report templates.
- Configuration of weight and Centre of Gravity reports. Assisting engineering and SPRD team in the configuration of the Catalog for weight and CoG computing.
- Configuration and extraction of Model Review sessions. Conversion to Navisworks and other formats.
- Supporting Design Team (all disciplines) for any issues and requests.
- Liaise with engineering discipline leads to smooth functioning of Projects.
- Continually seeking opportunities to increase end-user satisfaction
- Resolution of system errors, software related problems. Issue analysis and troubleshooting. Assure that design continuity is maintained throughout the entire Project.
- Synchronising changes between databases, monitoring scheduled runs, assisting designers with updates to 3D Model. Application and SQL level database maintenance and integrity checks to find corruptions and clear them.
Set-up:
Coordination:
Integration & Development:
Reference Data:
Deliverables Configuration:
Support & Troubleshooting:
Maintenance:
2016 - 2018
The Hague- Setting up IT database servers and database instances for S3D projects (production, testing and development). Setting up batch servers for batch processing.
- Monitoring for new content, tools and hot fixes, identify applicability to project and deploy.
- Conversion of 3rd party data to zvf using application tools, attaching to Smart 3D project.
- Coordinating scope, overall schedule, deliverables, milestones and coordination procedures.
- Coordinating subcontractors, other offices and JV partners within Global Workshare Environment.
- Answering how-to questions from users, Project Engineers and Project Information Managers
- Supporting Design Team (all disciplines) for any issues
- Assisting the SPRD Team in aspects like interface between SPRD and Smart 3D, testing and validation of new components and symbols.
- Configuration of Interference Checking process. Implementation and adjusting of codeless and/or code based interference rules based on project requirements.
- Participating in the development of new custom applications used to support and automate the Smart 3D tasks.
- Implementation of Rule Checker Service and rules development in .NET.
- Creation and customization of Reference Data per project/company standards. Project Catalog, Parts and codelists modifications. Defining and creating required custom attributes
- Reference Data change management. Supporting SPRD Piping Engineer and providing help to troubleshoot piping spec issues.
- Configuration of Smart 3D project deliverable templates including bi-lingual piping isometric,drawing view styles and custom reports using .NET and SQL.
- Fixing software configuration by making changes to the system. Resolution of system errors, software related problems.
- Continually seeking opportunities to increase end-user satisfaction
- Managing Smart 3D databases, performing periodical maintenance, integrity check and clean up.
Set-up:
Coordination:
Integration & Development:
Reference Data:
Deliverables Configuration:
Support & Troubleshooting:
Maintenance:
2014 - 2016
Warsaw- Performing all activities related to the administration of SmartPlant 3D.
- Creating and maintain the MSSQL production server databases.
- Setup and management of new and existing engineering projects within SmartPlant 3D.
- Interference Checking (IFC) setup and configuration.
- Backup & Restore.
- Database maintenance.
- Customising deliverables based on project requirements.
- Coordinating subcontractors, JV partners within disconnected (offline) workshare configuration.
- Assisting in resolution of system errors, software related problems.
- Creating and maintaining the P&ID content, such as: 2D symbols, labels, report templates, etc.
- Creating a project database and a project hierarchy
- Assisting in resolution of system errors, software related problems
- Creating new formats, rules, filters
- Backup & restore, drawing versioning
- Translation of SmartSketch Data into other 2D CAD Formats
SmartPlant 3D
SmartPlant P&ID
2012 - 2014
Cracow- Responsible for implementation, administration and maintenance of the SmartPlant 3D in Krakow Office.
- Providing administrative assistance to SmartPlant P&ID Administrator.
- Plant and piping design activities.
2011 - 2012
Cracow- Plant and piping design activities.
- Preparation of drawings, specs and MTOs.
- Creating isometric drawings using Autocad 2D.
- Assisting senior designer in design of custom process equipment.
2010 - 2011
Cracow- Plant and piping design activities.
- Preparation of drawings, specs and MTOs.
- Creating isometric drawings using Autocad 2D.
- Conducting fieldwork inclusive of walk downs of current systems, locating tie-ins and measuring.
- Coordination and preparation of documentation for state regulatory authorities.